Guernsey Press

Planning applications - 18 May, 2010

Applications to the Environment Department, as published in the Guernsey Press.

Published

Applications to the Environment Department, as published in the Guernsey Press.

CASTEL

Mr and Mrs D. Le Tissier – erect extension and timber decking to the north of the property, extend dwelling to the west, demolish chimney and extend other chimney above existing roof lights at Bumble Bee Cottage, Rue du Marais.

Mr R. Ridout – variations to works previously approved – increase ridge height of garage, raise ridge of dwelling and change roof material to natural slate, alter fenestration, alter size and position of rear dormer windows and install rooflights at Hanley House, Rue des Delisles.

Mr and Mrs J. George – variations to works previously approved to erect a pool house, also erect a plant room at Beachmount, La Giffardiere.

Mr and Mrs Gordon – install rooflight in front elevation at La Corniche, Courtil Ollivier, Rue des Varendes.

Mr M. Stockreiter – demolish part of existing wall to create car parking area at Bon Air, Route de Carteret.

FOREST

Mr and Mrs P. Rabey – erect shed and fencing at 7, Les Petites Nouettes, Les Nouettes.

ST ANDREW'S

Mr P. Marrett and Miss A. Bishop – install three rooflights on north east (rear) elevation at 3, Lilydale Cottage, Rue des Varendes.

ST MARTIN'S

Mr and Mrs A. Aspinall – extend and alter existing garage to create double garage and garden room, demolish existing greenhouse and remove oil tank at Redroofs, Les Traudes.

Headstart Nursery – change of use of premises to nursery/playschool at Les Huriaux Farm, Les Huriaux Road.

Mr N. Carrington and Ms D. Reid – erect a summer house at Banchory, Clos de Beaupre, Saints Road.

Mr and Mrs S. Knight – demolish existing conservatory to rear and erect sun lounge at Cancale, Jerbourg Road.

ST PETER PORT

Mr M. Angenent – demolish existing rear extension and construct new extension at 27, Jardin de Haut, Mont Arrive.

Mr R. Smith – construct first floor extension over existing ground floor extension at 3, Allez Street.

Mr Naftel and Mr Barnes – extension and alterations to rear of dwelling at 2, St James Place, Doyle Road.

Assembly Developments – demolish existing and erect three storey building accommodating two flats at St John's Cottage, Little St John Street.

La Manche Holdings – alter existing openings and install dormer window to front and dormer window to rear at 61, Victoria Road.

La Manche Holdings – demolish existing property to form three car parking bays, new vehicular access points and new walls at Hillside, Les Petites Fontaines.

Mr E. Evans – replace two second floor windows on the east elevation with French doors and install Juliette balconies, replace two road level windows with doors, and create roof level balcony on east elevation, install three rooflights on north elevation and two rooflights on the south elevation (Protected Building) at Apartment 4, Camblez House, Queen's Road.

R. C. Developments – install dormer window and two rooflights to rear at 2, Havilland Cottages, Havilland Hall Farm, Rue a L'Or.

Mr and Mrs S. J. Shires – remove hedge and extend and alter dwelling to rear and install rooflights and window to side at Kerinec, 2, Les Gravees.

Mr H. D. Shepherd – erect a sun lounge (rear elevation) at 1, Livingstone Villa, Stanley Road.

ST PETER'S

Mr and Mrs A. Tautscher – replace window in existing dormer on south elevation with smaller window and re-clad in clay tile at Jardin de Haut, Rue de L'Eclet.

Holmes Ltd – erect a front porch, install flue on west elevation and dormer window on north elevation. Install front entrance gates, oil tank enclosure and section of roadside wall. Alter fenestration and relocate front door at Bon Repos, Rue de Laitte.

Mr and Mrs D. Grundy – change of use of dwelling, dower unit and garage to two self contained dwellings, install rooflight and change garage door to residential door and window at Sunnydale Cottage, Route de Pleinmont.

ST SAMPSON'S

Aran Developments Ltd – widen existing vehicular access at Feldspar, Les Grandes Maisons Road.

R. G. Falla Ltd – residential development consisting of seven dwellings and nine apartments, together with associated parking and service road at Lowlands Road.

Martian Enterprises Ltd – demolish existing dwelling and erect two semi-detached dwellings at Sunset Cottage, Rue Queripel.

Mr and Mrs D. Prigent – raise height of existing fences to rear by fixing trellis to top at 16, Victoria Avenue.

Mr C. Corbin – erect single storey extension at rear of dwelling to form garage and sunroom at Hillcrest, Route du Camp du Roi.

Mr and Mrs S. Davidson – demolish existing conservatory, remove existing catslide dormer and erect a two storey pitched roof extension and a single storey extension at rear (south-east) elevation at Maladerie Cottage, Maladerie Road.

ST SAVIOUR'S

Mr J. Chadwick – erect a shed (retrospective) at Courtil de Rigeaux, La Grande Lande.

Mr and Mrs G. P. Gavey – demolish existing outbuildings and extension to rear of property. Raise ridge height and extend and alter dwelling to front, side and rear elevation. Install balcony and rooflights to rear and create parking area to front at Newlyns, Route des Clos Landais.

TORTEVAL

Mr and Mrs G. Cook – raise ridge height, install two dormer windows (one with a Juliette balcony), alter two existing dormers, reposition one rooflight and install full length glazing to gables in west and south elevations at Les Tielles de Bas, Rue des Tielles.

Mr and Mrs I. Galliott – install seven rooflights on west elevation and one rooflight on east elevation (convert roofspace) at Zermatt, Rue des Mares.

VALE

Mr S. Stewart and Ms A. Geluk – erect an underground garage, changing room and plant room and install swimming pool, alter vehicle access and instal gates and pillars at Eastview, Le Parcq Lane.

Mr and Mrs B. E. Veillard – extend and alter dwelling – erect bay window extension to front of property and extension to rear of property (exempt) at Aigle, Houmtel Lane.

Mr J. Kaill and Miss T. Cochrane – construct a flat roof extension to rear and side of dwelling at Arroya, Rue du Pont Vaillant.

Mr J. Guilbert – erect a conservatory at The Green, Rue Pelouse.

It is requested that anyone wishing to make representations about a particular application should submit them in writing to the Environment Department, at the address given below, within seven days of the publication of the above list.

However, if also advertised by site notice, the timescale for making representations will be 21 days from the first display of the site notice.

Minor applications may not be included as part of this list. However, a complete register containing details of all applications received is available for inspection by the general public at the Environment Department offices at Level 3, Sir Charles Frossard House, La Charroterie, St Peter Port, during the hours of 9am to 5pm Mondays to Fridays.

Please note that the content of any letters of representation are not treated as confidential by the department and will be disclosed, at their request, to the applicant, once the application has been determined. Representations will also be made available to the planning tribunal in the event of an appeal, and could be considered and discussed at a public tribunal hearing.

Sorry, we are not accepting comments on this article.