CASTEL

Mr D. Holt – erect single storey extension to rear of dwelling, alterations to conservatory and residential accommodation (install two rooflights); install six rooflights over existing single storey pitched extension; install three windows (east elevation) and one window (north elevation) at La Porte, Rue de la Porte.

Guernsey Water – erect one-metre mast and 700mm antenna on side of pumping station at Les Cherfs Pumping Station, Ruette des Cherfs.

Mr Gallienne and Ms Lewis – demolish existing and erect replacement dwelling at The Dell, Ruette des Forfaitures.

ST MARTIN’S

Health Investments Ltd – sub–divide property into two units (protected building) and reposition existing dormer window at Dieu Donne, La Bellieuse.

Mr D. Le Huquet – remove window, alter and install door (west elevation) at Block A, Les Huriaux Farm Complex, Les Huriaux Road.

Messrs J. A. and D. J. Snell and Mrs M. G. Snell – infill existing entrance (south boundary) form new entrance and install a three-metre-wide field gate (north boundary) at field, Les Mouilpieds.

Constables of St Martin's – replace shed at St Martin's Cemetery, La Rue des Frenes.

Dix Neuf Ltd – erect a marquee between 25 May 2015 and 30 September 2015 (protected building) at the Bella Luce Hotel, La Fosse de Bas.

Guernsey Water – install a one–metre mast to side of pumping station at Le Varclin Pumping Station, Vaux du Varclin, Le Varclin.

ST PETER PORT

Dr S. Eckhardt – demolish existing dwelling and erect three new apartments, create additional vehicular access, reduce height of roadside boundary walls and form new car parking (revised) at Frimley, Rouge Rue.

Seahorse Ltd – variations to plans previously approved to erect apartment block of 12 units of residential accommodation with associated parking – install additional door and rooflight (retrospective) and apply signage (east elevation) at Salerie Corner site, Salter Street.

LP Entertainment – alterations to Luna Bar entrance and formation of entry booth serving Fusion entrance at 54, Le Pollet.

Constables of St Peter Port – erect section of railings along new kerb at St Peter Port constables' office, Lefebvre Street.

Bao Ltd – change of use from retail (retail use class 14) to cafe/takeaway (retail use class 15) and internal alterations (protected building at 3-5 Mansell Ltd.

PJP Holdings Ltd – replace and reposition metal fire escape staircase at Les Gravees Court, Les Gravees.

Advocate and Mrs G. Allez – construct car port (protected building) at The Cottage, 56, Hauteville.

Mrs S. Sendlhofer – remove hedge and erect a fence (southwest boundary) at Havelet Mede, Havelet.

ST SAMPSON’S

Guernsey Water – construct land outfall chamber at foreshore adjacent to Red Lion slipway, Les Banques.

J. and D. Norman Ltd – install external electrical cabinet (front elevation) at Storage Unit (ex-Commodore), Bulwer Avenue.

Bridge Floral Group – install granite block seating and planters at Le Crocq.

Mr B. Wells and Miss H. Wyatt – raise ridge height and extend and alter dwelling and install new balcony on north elevation at Karinya, Les Sauvagees.

Howkev Ltd – erect signage on front of building at Unit 4, Braye Road Industrial Estate, La Route du Braye.

Mr S. Roussel – demolish wall to create vehicular parking in front of dwelling at Dorset Mist, 2, Devonia Court, Les Petites Capelles Road.

Mr and Mrs J. Sebire – replace shed and boiler house with temporary hay, machinery and livestock store and erect new shed/garden room at Glenshee, Rue Sauvage.

TORTEVAL

Mr and Mrs A. Robinson – alter and replace existing conservatory roof with tile roof at Derravaragh, Les Laurens.

Mr R. A. Humphries – demolish chimney stack and install a stainless steel flue at Les Houguillons, Route de Pleinmont.

VALE

Vale Mill Ltd – install windows, doors and erect external staircase to convert mill into dwelling (protected monument) at Vale Mill, Hougue du Moulin.

Environment Services Unit – remove hedging, install paving and create disabled access at Northside Plantation (incorporating Interpretation Centre), North Side.

Mrs L. Tulie and Mrs T. Turner – alter and convert workshop to a dwelling house at Innsbruck, Route du Camp du Roi.

It is requested that anyone wishing to make representations about a particular application should submit them in writing to the Environment Department, at the address given below, within seven days of the publication of the above list.

However, if also advertised by site notice, the timescale for making representations will be 21 days from the first display of the site notice.

Applications are normally published in the Guernsey Press shortly after they are received as valid and this advertisement may appear before the site notice is erected. Minor applications may not be included as part of this list. However, a complete register containing details of all applications received is available for inspection at the department's offices at Level 3, Sir Charles Frossard House, La Charroterie, St Peter Port, between 9am and 5pm, Mondays to Fridays.

Please note that the content of any letters of representation are not treated as confidential by the department and will be disclosed, at their request, to the applicant, once the application has been determined.

Representations will also be made available to the planning tribunal in the event of an appeal, and could be considered and discussed at a public tribunal hearing.

Sorry, we are not accepting comments on this article.